Taking a Church from a Temporary Setup to a Permanent Install, Part 2
Show 77-2
To hear the podcast press the play button or download here. Or read the transcription.
In this edition of the SVC Podcast, SVC Contributing Editor Bennett Liles continues his discussion with Wade Russell of Elite Multimedia in Memphis, Tennessee about the temporary and then permanent sanctuary AV installation done by his firm at the First Church of the Nazarene in Marion, Ohio. In part two, Wade provides details on the equipment and installation for the permanent sanctuary where the congregation moved from the gym after construction was complete.
Links of interest:









